Operation Demonstration Steps for the Parallel Photoreactor AF3 from Shanghai 3S Tech

2026-03-02
abstract:

photoreactor,led photoreactor,parallel photoreactor,photochemical reactor,photocatalysis reactor

Pre-inspection and Installation: Check the appearance and component integrity of the instrument. Insert the reaction tubes into the corresponding slots, ensuring that the reaction tubes are vertically aligned with the lamp tubes to avoid light dead zones.

Startup and Settings: Connect the power supply and the temperature-controlled circulating water. Turn on the instrument switch and set parameters such as power, rotation speed, and timing duration through the operation panel.

Operation and Monitoring: Initiate the experiment, observe the operating status of the instrument, and record data such as temperature and rotation speed in real time to ensure stable reaction conditions.

Completion and Tidying Up: After the experiment is finished, first turn off the instrument switch, then disconnect the power supply and the temperature-controlled circulating water. Remove the reaction tubes and clean the instrument.



view more
Related Reading

18221306212